Bathroom Renovation
Complete bathroom renovation from a single source — from planning to handover.
Scope of Services
Planning & Consultation
3D visualization, material selection, cost plan
Tiling
Wall tiles, floor tiles, mosaic, large format
Plumbing Installation
Shower, bath, WC, basin — all from one source
Accessible Bathroom
DIN 18040-2, level access shower, grab rails, KfW-fundable
Electrical & Lighting
Wet room lighting, sockets, electric underfloor heating
How your bathroom renovation runs
Consultation with your wishlist: usage, style, budget range and accessibility.
Measurements and planning: layout proposal with sanitary objects and a materials list.
Fixed schedule including construction-waste disposal.
Execution from one source: demolition, plumbing, tiling, electrics and fitting the objects.
Final acceptance with a function test of all connections.
How to prepare
Helpful: a collection of reference images, a rough budget idea and whether the bathroom must stay usable during the works (alternative shower).
Bathroom renovation FAQs
How long does a complete bathroom renovation take?
Usually 2–3 weeks depending on scope. We schedule the trades so there are no waiting gaps and keep the schedule tight.
Can I shower during the works?
We discuss this in advance — for one bathroom it is usually unavoidable that it is out of use for a while. Solutions such as an alternative shower or scheduling are discussed individually.
Do you also supply the fittings?
Yes — we plan and procure sanitary ceramics, fittings and materials through the manufacturers we work with. You get one package instead of placing individual orders.